Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

May 30, 2023     Completed center section - (6 hours)       Category: Fuselage
Finished up work on the center section spar. Cover supports drilled to spar, holes enlarged as needed, snap bushing holes upsized and installed. The smaller cover support gets a angle stiffener on the opposite side that is flush riveted to the center section and has nut plates that the support screws into, I assume so you can easily take it off for wire runs, maintenance, etc. once everything was cleaned up, primed what was needed, items were riveted and or bolted per plans.

The two center spar sections were temporarily placed together with the spacer tubes in place to make sure it was ok. Seemed good to me, oh and btw, the spacer tubes are already made to the correct length. Look in your wing kit hardware bags.


 